ALTANGADAS GOLD PROJECT
Gobi Altai Province, Mongolia
Strategic Location








Strategic Access
Approximately two hours by commercial flight from Ulaanbaatar, with a well-maintained paved road access to our Altai mining site.
Mountain Elevation
Located between 1,860–2,090m above sea level within the Zavkhan Basin.
Hydropower Infrastructure
High-voltage powerlines from Taishir hydropower station cross the property.
Water Reservoir Access
Water resources supported by nearby reservoir and artesian sources.
Climate Profile
Dry summers, cold winters and moderate annual precipitation.
Mining-ready Infrastructure
Infrastructure & Access
- Highway linking Khovd and Bayankhongor.
- Paved road to Taishir Soum District.
- Altai Town - Essential services, administrative centre & domestic airport.
- High-voltage power lines across property.
- Connected to 11 MW Taishir Hydropower Plant.
- Starlink internet coverage on site.
Power & Water Supply
190m
Concrete Gravity Dam Height~1bn m³
Reservoir Capacity54 km
Planned Potable Water Pipeline11 MW
Hydropower Plant CapacityMining Licence Information
Parcel 1 – Graceland
Minerals: GOLDParcel 2 – Havilah
Minerals: GOLDParcel 3 – Quartzgold
Minerals: GOLDParcel 4 – Jurrassic Energy
Minerals: COAL
Placer Gold Production
Placer gold have been found in a 5 km narrow valley within our license approximately 3 km away from Parcel 1.
Exploration by bulk sampling in 2020, 2021 and 2022 indicated more than 100 kg of gold.
We will be using the sluicing method with our proven wash plant machine. Ground water and water pond by local council, EIA report and operating approval all have been obtained for our production to begin in May 2026.
Placer gold valley locally known as Narrin Am valley.
Geological Highlights


Year 2026
Altangadas project constitutes an excellent gold prospect and is expected to be developed into a highly profitable mine, with at least 20kg gold production in 2026.