ALTANGADAS GOLD PROJECT

Gobi Altai Province, Mongolia

Strategic Location

01

Strategic Access

Approximately two hours by commercial flight from Ulaanbaatar, with a well-maintained paved road access to our Altai mining site.

02

Mountain Elevation

Located between 1,860–2,090m above sea level within the Zavkhan Basin.

03

Hydropower Infrastructure

High-voltage powerlines from Taishir hydropower station cross the property.

04

Water Reservoir Access

Water resources supported by nearby reservoir and artesian sources.

05

Climate Profile

Dry summers, cold winters and moderate annual precipitation.

Mining-ready Infrastructure

Infrastructure & Access

  • Highway linking Khovd and Bayankhongor.
  • Paved road to Taishir Soum District.
  • Altai Town - Essential services, administrative centre & domestic airport.
  • High-voltage power lines across property.
  • Connected to 11 MW Taishir Hydropower Plant.
  • Starlink internet coverage on site.

Power & Water Supply

190m

Concrete Gravity Dam Height

~1bn m³

Reservoir Capacity

54 km

Planned Potable Water Pipeline

11 MW

Hydropower Plant Capacity

Mining Licence Information

Licence Number MV-MINING LICENSE
Licence Holder Realxoin Resources LLC
Gold Resource estimate at 29.2 tonnes
Validity 30 Years
Expiry 2052
Altangadas Gold Project
Land size of 7,799 hectares mining licence which was converted from exploration licence in January 2022. The mining licence is valid for an initial 30 years, with expiration in 2052 and further extension of up to 70 years after 2052.
Our plans for 2026 is to mine placer gold in a valley within Altangadas and to complete a targeted 99 drill holes in Parcel 1, Graceland, with a total cores of 20,000 meters. We forecast an eventual JORC resource of up to 60 tonnes of gold in Parcel 1.
The whole of Altangadas Mining license is divided into 4 parcels.
Our long-term vision is to build a sustainable, responsible gold mine project and contribute to western Mongolia’s development.

Parcel 1 – Graceland

Minerals: GOLD

Parcel 2 – Greenland

Minerals: GOLD

Parcel 3 – Quartzland

Minerals: GOLD

Parcel 4 – Jurrassicland

Minerals: COAL
Key Highlights
Altangadas gold mining project is located in a prospective gold-mineralized environment, near Altai in Western Mongolia. A significant amount of exploration work has been carried out over the area including geological mapping, rock-chip sampling, diamond drilling and laboratory test analyses. With extensive IP and Magnetic Mapping from the last 2 years, we have identified in Parcel 1, a large anamoly area of 550 m X 350 m. We believe the mother lode is within here.
Over the past 7 years, Realxoin Resources completed 47 drill holes totaling more than 10,000 meters over the Greisen Target. Core results range from 0.5 g/t to 5.82 g/t, Estimated Gold Resource of 29.2 tonnes.

Placer Gold Production

Placer gold have been found
in a 5 km narrow valley within our license approximately 3 km away from Parcel 1.

Exploration by bulk sampling in 2020, 2021 and 2022 indicated more than 100 kg of gold.
We will be using the sluicing method with our proven wash plant machine. Ground water and water pond by local council, EIA report and operating approval all have been obtained for our production to begin in May 2026.

Placer gold valley locally known as Narrin Am valley.

Placer & Initial Gold Discovery
157 holes confirmed mineralization, with samples up to 138 g/t.
Orogenic Gold & Quartz Veins
Strike lengths of 200–500 m, grades up to 5.82 g/t.
Geophysical Survey
Three magnetic anomalies identified with strong sulphide potential.
2026 Drilling Program
Planned 20,000 m / 99 holes, JORC compliant GOLD Resource by SRK Mongolia.
Target: 2027 JORC Resource
Estimated 80 tonnes across 5 mineral zones.

Year 2026

Altangadas project constitutes an excellent gold prospect and is expected to be developed into a highly profitable mine, with at least 20kg production in 2026.

Realxoin Resources LLC